Accredited by 'Visit England'

Fantastic news, we have now been added to the list of Blackpool Approved hotels.

(See our certificate of accreditation)  

March25


PAT Testing Certificate

In todays world it is always good to make sure your guests are safe, we are proud to announce that one staff member has now passed a PAT course. During 2025 we are planning to get every portable appliance logged and tested. This will then be an ongoing maintenance plan

March25


Certificate of Achievement

We have been awarded a certificate of achievement for the work we have been doing with the Blackpool Net Zero team

March25


Ongoing renovations over the winter months

Over the last few months we have been working on some external work:

-  Flat Roof repairs.

-  Storm Gulley repairs.

 -  Painting of exterior walls

(November 24 - March  25)

New Ventures

We are delighted to announce that we have started a couple of new ventures:

1. Waffle Weeks / Nights

2. Packup lunch 

(October 24)

Grant Fund - Net Zero

After working with Blackpool Net Zero Business Academy we are delighted to announce that we have been awarded a grant which has been put toward a new state of the art Electric Water Heater and 6 internal bathroom sensor lights.

Read more about our journey HERE

(October 24)

Ground floor Toilet

After listening to customer feedback work has commenced on the installation of a new ground floor toilet, all work should be completed by Summer 2025

(October 24)

2024  Competition  Winners

October saw us celebrate our 500th guest checked in. To celebrate this occasion this lovely couple bagged themselves a free 2 night stay with breakfast.

(October 24)

October saw us celebrate our 500th guest checked in. To celebrate this occasion this lovely couple bagged themselves a free 2 night stay with breakfast.

(October 24)

New Electric Board Installation

We closed the hotel for a week to get a brand new up to date electrical board fitted, this will make it easier as we upgrade the rooms to connect to the new board.

(Thanks to Andrews Electrical - Blackpool)

(September 24)

Installation of Infrared Bar Heaters (Dining Room)

Installation of two new infrared Bar heaters for the dining room, this will keep our guests warm during the winter months

(September 24)

New Freezer Purchased

Out with the old chest freezer and in with the new upright freezer

(August 24)

New Insulation & Soundboard 

Insulation and Soundboard delivered for renovation to room 3 & the start of the ground floor toilet

(March 24)

Basement Tanking Complete 

Further updates to the structure of the property that our guests never see.

The front of the basement has been professionally tanked by the RTC GROUP (Home - RTC | RTC Group)

Whilst there is still a fair bit of work to do to get it 'usable' we would like to thank Jamie Willacy and his team for all their hard work on this challenging project.

(31/01/2024)

Before

                       

After


Exterior Upgrade Complete 

40+ New Windows 'complete'
New render 'complete'
New facias, soffits and guttering 'complete'
Bring on 2023 season!
(Before and after photos)

(16/05/2023)

             

Sponsorship - Jessica Page

We’re pleased to announce Hotel 242 has sponsored Jess Page of Pride Park FC

(16/05/2023)

Sponsorship - Tash Allderidge

We’re pleased to announce Hotel 242 has sponsored Tash Allderidge of Pride Park FC

(12/04/2023)

New Beds

Our first delivery of new beds and mattresses has arrived, thanks to The Reinforced Bed Company for the first-class service.

(25/03/2023)

New Bedding

Our last delivery of bedding has arrived supplied by Julian Charles Fleetwood, great products & service.

(25/03/2023)

Signage Restored

New signage has been restored to the property thanks to Granthams Signs Ltd for their great work.

(16/02/2023)

Exterior Soil Pipes

Since moving into 242 we knew there were multiple soil pipe issues that needed to be rectified. Not really knowing anyone local we contacted a number of companies and had lots of different ideas. We then met Karl from JF Drainage and what a great experience we have had, first class advice, first class service and a team that worked extremely hard through some very very cold weather.

Thanks for all your hard work, highly recommended and our preferred contractor for drainage issues going forward.

(31/01/2023) 

Flat Roof Repair

During the last few days some of our customers may have seen that we had some slight leaks to the flat roof at the front to the property. We are happy to announce that Steve (The Roofer) has been and repaired the leak and will be returning tomorrow to strip and renovate the flat roof to the rear of the property. 

"We are ready for West Coast Winter" (17/10/2022) 

Upgraded - Vaillant Boiler

Vaillant are one of the leading manufacturers of boilers in the UK and as new owners of H242 we were keen to get a new boiler in place before the end of the season. It was great to find a partner to work with on a very tight deadline, so a big shout out to ‘A Class Plumbing and Electrical Ltd’.

Jack and team were fantastic from start to finish and we would like to thank him for all his hard work! (14/10/2022)

Upgraded Wi-Fi

As new owners of Hotel 242 we have been listening to our guest feedback and we are pleased to announce we have now upgraded our WiFi. We have installed a new Virgin Media line with a 600Mbs speed which is connected to a Deco TP-Link mesh system, this will now provide a powerful WiFi to cover every corner of Hotel 242. (28/09/2022)

Book Online

Our Facilities


  • Free Wifi
  • Freeview
  • On The Beach
  • Parking On-site Limited